Bids - Closed

Lead Abatement and Exterior Painting at Three Campuses: Center Street, District Office, and Warehouse
Bid #19-011
 
Bid scope: Lead abatement and painting of all painted exterior surfaces and all exterior doors (both sides) at three locations: 
  • 641 Sheldon Street, El Segundo, CA 90245 (six buildings)
  • 700 Center Street, El Segundo, CA 90245 (entire school campus, minus two modular classrooms)
  • 210 Penn Street, El Segundo, CA 90245 (three buildings)
 
Bid deadline: 2:00 p.m. on June 28, 2019, at 641 Sheldon St., El Segundo, CA 90245
Required License: C-33 license as well as Lead Abatement Supervisor certification from the CDPH
 
Bid documents are available on the Open Bids page on the El Segundo Unified School District webpage.
 
There will be a non-mandatory Pre-Bid Conference on Tuesday, June 18, 2019 at 9:00 a.m. at the District Office at 641 Sheldon St., El Segundo, CA 90245.
 
Please contact Dylan Farris, Executive Director of Human Resources and Facilities with questions: dfarris@esusd.net.
 
El Segundo High School Science Building HVAC Retrofit Project - Bid #19-006

Job Walk: April 17th, 2019 at 9:00 a.m.

El Segundo High School

640 Main St. 

El Segundo, CA 90245

 

Bids Due: April 26th, 2018 at 2:00 p.m.

El Segundo Unified School District

641 Sheldon St.

El Segundo, CA 90245

 

Contact: Dylan Farris, dfarris@esusd.k12.ca.us

 

Bid awarded to RT Contractor Corp.

 

Winning Bid: $384,000

 

Bid Docs

 

DSA Approved Plans

 

Job Walk Sign In

 

 

 

 

AC Paving Resurfacing and Re-striping at Six (6) Sites - Bid # 1/2018-19

  

Bids Due: July 3, 2018 at 11:00 a.m.

El Segundo Unified School District

641 Sheldon St.

El Segundo, CA 90245

 

Contact: Alfredo Perez, (310) 615-2650, ext. 1502 or aperez@esusd.k12.ca.us

Please note: All questions will be responded to by June 27th (not prior).

 

 

Bid Documents

 

Addendum #1

 

Addendum #2

 

 

 Bid Results: Low Bidder - Williamson Construction: $135,000.

 

 

 

 

 

 

 

 

 

 

Richmond St. Elementary and Center St. Elementary Fencing Project - Bid #19-005

Job Walk: August 14, 2018 at 9:00 a.m.

Center Street Elementary School

700 Center St. 

El Segundo, CA 90245

 

Bids Due: August 17, 2018 at 9:00 a.m.

El Segundo Unified School District

641 Sheldon St.

El Segundo, CA 90245

 

Contact: Dylan Farris, dfarris@esusd.k12.ca.us

 

Bid Docs

 

Bid Docs - Attachment A - Richmond Street Specs

 

Bid Docs - Attachment B - Center Street Specs

 

Job Walk Sign In

 

Addendum #1

 
Bid Awarded to Quality Fence: $132,473
 

 

 

Demolition of Existing TLC Building - Bid # 19-004
 

Job Walk: July 25, 2018 at 10:00 a.m.

Richmond Street Elementary School

615 Richmond St. 

El Segundo, CA 90245

 

Bids Due: August 3, 2018 at 10:00 a.m.

El Segundo Unified School District

641 Sheldon St.

El Segundo, CA 90245

 

Contact: Alfredo Perez, aperez@esusd.k12.ca.us

 

 

Bid Documents

 

Attachment A- Specs

 

Additional Information- Building Materials Survey Report

 

Job Walk Sign In

 

Addendum #1

 

Addendum #2

 

Addendum #2 Reference Drawing

 

Addendum #2 Soils Report

 

Addendum #2 Power Pole Specs

 

Bid awarded to Danny Ryan Precision Contracting: $87,000

 

Demolition of Existing TLC Building - Bid # 19-004

 

Job Walk: June 27, 2018 at 9:00 a.m.

Richmond Street Elementary School

615 Richmond St. 

El Segundo, CA 90245

 

Bids Due: July 3, 2018 at 9:00 a.m.

El Segundo Unified School District

641 Sheldon St.

El Segundo, CA 90245

 

Contact: Alfredo Perez, (310) 615-2650, ext. 1502 or aperez@esusd.k12.ca.us

 

Bid Documents

 

Attachment A - Specs

 

Additional Information - Building Materials Survey Report

 

Addendum #1

 

Addendum #2

 

Addendum #3

 

Job Walk Sign

 

Addendum #4

 

Bids

 

Bid Results- Rejected all bids.

Integrated Waste Management Services - Bid # 18-001
 

Bids Due: July 13, 2018 at 10:00 a.m.

El Segundo Unified School District

641 Sheldon St.

El Segundo, CA 90245

 

Contact: Kimberlie Linz, klinz@esusd.k12.ca.us

 

Bid Document

 

Addendum #1

Richmond Street Elementary School Stairs - Bid # 4/2017-18

 

Pre-bid Conference: May 9, 2018 at 9:00 a.m.

Richmond Street Elementary School

615 Richmond St.

El Segundo, CA 90250

 

Bids Due: May 17, 2018 at 2:00 p.m.

El Segundo Unified School District

641 Sheldon St.

El Segundo, CA 90245

 

Bid Documents

 

Modification Plans

 

Addendum 1

 

Ad for Bids

 

Job Walk Attendance

 

Bid Results: Low Bidder - Williamson Construction: $108,000.

El Segundo Middle School Field Fencing
Bid #20-001
 
Bid scope: Installation of approximately 792 linear feet of 6' galvanized chain link fencing to include three 4' X 6' utility access gates.  
 
Bid deadline: 9:00 a.m. on Thursday, July 25, 2019, at 641 Sheldon St., El Segundo, CA 90245.
 
Bid documents are available on the Open Bids page on the El Segundo Unified School District webpage.
 
There will be a non-mandatory Pre-Bid Conference on Tuesday, July 16, 2019 at 9:00 a.m. at El Segundo Middle School, 332 Center St., El Segundo, CA 90245.
 
Please contact Ali Rabiei, Director of Operations with questions: arabiei@esusd.k12.ca.us.

19-012: EL SEGUNDO HIGH SCHOOL & MIDDLE SCHOOL PERIMETER FENCING

 

Scope: 

El Segundo High School: All construction and services required to provide the installation and site improvements including new perimeter fencing consisting of brick veneer pillars with 8’0” high ornamental and chain-link fencing.

 

El Segundo Middle School: All construction and services required to provide the installation and site improvements including new 7’11” high ornamental security fencing, replacement of existing chain-link fence with new 7’11” high ornamental fencing, replacement of existing chain-link fencing with 7’11” high chain-link fencing, and alteration of plant bed to create a sloped walkway

 
Prime Contractor’s License Requirements: A  or B or C 13
 
There will be two (2) non mandatory Pre-Bid Conferences at December 10, 2019 at 2PM and December 17, 2019 at 2PM at the El Segundo High School, Entrance Lobby at 640 Main Street, El Segundo, CA 90245.
 
RFI Deadline: Submit all RFI’s via the web based project management software Procore, no later than January 3, 2020, by 4pm.
 
BID DOCUMENTS: Bid Documents are available from TELACU Construction Management. Contact personnel below. 
 
BID OPENING: Sealed Bids must be received no later than Thursday, January 16th, 2020 by 3:30 PM. at the El Segundo Unified School District, District Office. The site address is 641 Sheldon Street, El Segundo, CA 90245 at which time the bids will be opened and publicly read aloud.
 
CONTACT PERSONNEL: 
Josse Welch

Project Manager

TELACU Construction Management

M 714.497.9659

jwelch@TELACU.com

 

Preeti D'Souza

Program Manager

TELACU Construction Management

M 714.788.2617

pdsouza@TELACU.com

BID 21-001

MULTI-YEAR PREVENTATIVE MAINTENANCE CONTRACT FOR THE HEATING, VENTILATION, AND AIR CONDITIONING EQUIPMENT FOR SCHOOL DISTRICT BUILDINGS

Issued: August 14, 2020

 

Mandatory Pre-Bid Walk Through

August 19, 2020 at 1:30

starting at Richmond Street School

615 Richmond St

El Segundo, CA 90245

 

SECOND OFFERING OF A MANDATORY PRE-BID WALK THROUGH

August 26, 2020 at 9am

starting at Richmond Street School

615 Richmond St

El Segundo, CA 90245

If you already attended the August 19th walk through, you need not attend the second offering.

 

Bids Due

September 1, at 5:00pm

PLEASE NOTE THAT THE DEADLINE HAS BEEN CHANGED FROM 2PM TO 5PM

at District Offices, 641 Sheldon Street

El Segundo, CA 90245

 

elsegundousd.org

 

Contact Ali Rabiei, Director of Operations, arabiei@esusd.net for more info.

 


BID NO. 20-002 ESUSD Summer Modernizations

 

El Segundo Unified School District will begin construction on ESUSD Summer Modernizations projects. The scope of the projects involve:

 

 

Richmond Street Elementary School:

  • Addition of a Security Vestibule, Replacement of Existing Windows at the main classroom/ Administration building.
  • Installation of a 20’x 40’ shade structure (PC approved by Dave Bang) and concrete slab, Installation of ornamental fence and gates, Accessibility upgrade to restrooms. Material for shade structure will be provided.

El Segundo Middle School:

  • Alteration of existing Administration Office, addition of 800sqft office space into existing covered breezeway.

Center Street Elementary School

  • Addition of two (2) shade structures (PC approved by Dave Bang) at two locations on campus. Site improvements; walkways and landscaping. Material for shade structures will be provided.

El Segundo High School

  • Security Vestibule in the Main Building, Replacement of Engineering Building windows, Replacement of baseball field fencing, Replace hoops, bleachers, refinish flooring in the South Gymnasium, Replace flooring in the North Gymnasium

 

Bid Information:

  • Estimate is $6,000,000 with an Allowance Amount of $500,000. 
  • Construction is expected to begin in June 2020 with project completion in August 2020. Project delivery method is be Design- Bid-Build. Contract to be awarded to one Prime Contractor. Prime Contractor’s License Requirements: B
  • TELACU Construction Management will manage the Prequalification and Bid process. 
  • There is no Project Labor Agreement on this job. 
  • Prequalification requirements: Prime Contractor: All contractors with a B license that intends to bid as the General Contractor/ Prime Contractor directly to the District. First-tier Subcontractors: A contractor with an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, C-46 license(s) that intends to bid as a first-tier subcontractor to the prime contractor that is bidding directly to the District.
  • Prequalification documents must be submitted via email by April 24th, 2020 at 4pm. Attn: Preeti D'Souza, Program Manager, TELACU Construction Management. It can also be delivered to El Segundo Unified School District located at 641 Sheldon, El Segundo, CA 90245.
  • RFI’s shall be submitted via email by no later than Friday at E 1st May 2020, by 4pm.
  • There will be two (2) non-mandatory job walks on Thursday 16th April, 2020 at 2PM, and Thursday 23rd April, 2020 at 2PM at the El Segundo High School, Administration Lobby Located at 640 Main Street El Segundo, CA 90245.
  • Bids are due before 2.00pm on Monday 18th, May 2020 at the District Office, 641 Sheldon Street, El Segundo, CA 90245. 

 

Thank you for your interest in our upcoming project. If you have any questions please contact:

Preeti D'Souza 

pdsouza@telacu.com                   

21-003 ESUSD High School South Gymnasium Ramp

 

El Segundo Unified School District will begin construction on the ESUSD High School South Gym Ramp Project. The scope of the project is to demolish the existing landing and ramp. Contractor to provide for the installation and site improvements for a new concrete ramp, guardrails and asphalt at the El Segundo High School South Gymnasium.

 

Bid Information:

  • The estimate is $25,000 with an Allowance Amount of $5,000. 
  • Construction is expected to begin in October 2020 with project completion in November 2020. The project delivery method is to be Design- Bid-Build. Contract to be awarded to one Prime Contractor. Prime Contractor’s License Requirements: B
  • TELACU Construction Management will manage the Bid process. 
  • There is no Project Labor Agreement on this job. 
  • RFI’s shall be submitted via email by no later than Thursday 1st October 2020, by 4pm via email to the contact people listed below. 
  • There will be one (1) non-mandatory job walks on Wednesday 30th September, 2020 at 12:00 PM at the El Segundo High School, Administration Lobby Located at 640 Main Street El Segundo, CA 90245.
  • Bids are due before 2.00 pm on Tuesday 6th, October 2020

 

If you need further assistance or have questions on this Bid  please contact  TELACU:

 

Karim Estafanous

kestafanous@telacu.com

Miguel Camacho

mcamacho@telacu.com

 

21-004 ESUSD Center Street Perimeter Fencing

 

El Segundo Unified School District will begin construction on the Center Street Perimeter Fencing Project. 

 

Bids are due on Thursday January 28th, 2021 before 2PM at the District Office located at 641 Sheldon Street, El Segundo, CA 90245. 

 

Scope: All construction and services required to provide for the installation and site improvements for new perimeter fencing consisting of chain-link fencing.

 

Estimate: $285,000 plus an allowance Amount of $20,000. 

 

Prevailing Wages. Pursuant to sections 1770 et seq. of the California Labor Code, Bidder and all Subcontractors under the Bidder shall pay all workers on all work performed pursuant to the Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the State of California Department of Industrial Relations (DIR) for the type of work performed and the locality in which the work is to be performed within the boundaries of the District.

 

Each Bidder must complete and submit all of the following documents as its Bid:

  • Bid Form
  • Bid Bond or other security
  • Designated Subcontractors List
  • Noncollusion Declaration
  • Iran Contracting Act Certification

 

Schedule: Construction is expected to begin late February 2021 with project completion in May 2021.

 

License Requirements: Contract to be awarded to one Prime Contractor. Prime Contractor's License Requirements: B or C-13. Any subcontractor should have any license required for the scope of work they are performing. 

 

There is no Project Labor Agreement on this job. 

 

No pre-qualification required.

 

Thank you for your interest in our upcoming project. If you have any questions please contact:

 

Miguel Camacho 

Project Engineer 

Mcamacho@TELACU.com

 

 
21-005 ESUSD High School Library Modernization Project

El Segundo Unified School District will begin construction on the ESUSD High School Library Modernization Project. The scope of the projects involve:

 

Renovation of existing Library with new interior finishes, lighting, interior storefront, and modification to the existing Fire Suppression System.

 

Bid Information:

  • Estimate is $1,200,000 with an Allowance Amount of $100,000. 
  • Construction is expected to begin in May 2021 with project completion in August 2021. Contract to be awarded to one Prime Contractor. Prime Contractor’s License Requirements: B
  • TELACU Construction Management will manage the Prequalification and Bid process. 
  • There is no Project Labor Agreement on this job. 
  • Prequalification requirements: Prime Contractor: All contractors with a B license that intends to bid as the General Contractor/ Prime Contractor directly to the District. First-tier Subcontractors: A contractor with an C-6, C-7, C-10, C-15, C-16, C-17 C-20, C-36 license(s) that intends to bid as a first-tier subcontractor to the prime contractor that is bidding directly to the District.
  • Prequalification documents must be submitted via email by March 17th, 2021 at 4pm. Via email to Shannon Lutterloh, slutterloh@esusd.k12.ca.us or mailed to El Segundo Unified School District, 641 Sheldon, El Segundo, CA 90245, 
  • RFI’s shall be submitted via email no later than 4 PM on March 23rd, 2021 to Bobby Dieken rdieken@telacu.com or Preeti D'Souza pdsouza@telacu.com.  
  • There will be two (2) non-mandatory job walks on Tuesday March 9th, 2021 and Monday March 15th, 2021 at 3PM at the El Segundo High School, Administration Lobby Located at 640 Main Street El Segundo, CA 90245.
  • Bids are due before 2.00pm on Thursday April 1st,2021.
 

 Each Bidder must complete and submit all of the following documents as its Bid:

  • Bid Form
  • Bid Bond or other security
  • Designated Subcontractors List
  • Noncollusion Declaration
  • Iran Contracting Act Certification

 

Thank you for your interest in our upcoming projects. If you have any questions please contact:

 

Bobby Dieken

rdieken@telacu.com

Preeti D'Souza                                

pdsouza@telacu.com    

 

 

 

21-006 ESUSD Center Street Library Modernization Project 

 

El Segundo Unified School District will begin construction on the Center Street Library Modernization Project.

 

Bids are due on Thursday, April 1st, 2021 before 2PM at the District Office located at 641 Sheldon Street, El Segundo, CA 90245. 

 

Scope: All construction and services required to provide the alteration of the existing library space at Center Street Elementary School.

 

Estimate: $400,000 plus an allowance Amount of $35,000. 

 

There will be two (2) non-mandatory job walks on Thursday 11th March, 2021 at 3PM, and Thursday 18th March, 2021 at 3PM at the Center Street Elementary School located at 700 Center St, El Segundo, CA 90245. Meet outside the Administration Office on the sidewalk.

 

Prevailing Wages. Pursuant to sections 1770 et seq. of the California Labor Code, Bidder and all Subcontractors under the Bidder shall pay all workers on all work performed pursuant to the Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the State of California Department of Industrial Relations (DIR) for the type of work performed and the locality in which the work is to be performed within the boundaries of the District.

 

 Each Bidder must complete and submit all of the following documents as its Bid:

  • Bid Form
  • Bid Bond or other security
  • Designated Subcontractors List
  • Noncollusion Declaration
  • Iran Contracting Act Certification
 

Schedule: Construction is expected to begin May 2021 with project completion in August 2021.

 

License Requirements: Contract to be awarded to one Prime Contractor. Prime Contractor's License Requirements: B. Any subcontractor should have any license required for the scope of work they are performing. 

There is no Project Labor Agreement on this job. 

No pre-qualification required.

 

Thank you for your interest in our upcoming project. If you have any questions please contact:

 

Miguel Camacho 

Project Engineer 

Mcamacho@TELACU.com

Preeti D'Souza

Bond Program Manager 

Pdsouza@TELACU.com

 

 

21 – 007 ESUSD High School Baseball Field Improvements

El Segundo Unified School District will begin construction on the ESUSD High School Baseball Field Improvements Project. The Scope will include: 

All construction and services required to provide the improvements for the El Segundo High School Ballfield.

 

Bid Information:

  • Prime Contractor's License Requirements: B/C13
  • TELACU Construction Management will manage Bid Process and Construction Management. 
  • There is no Project Labor Agreement on this job. 
  • RFI's Should be submitted via email no later than Friday June 11th, 11:00 AM.
  • To set up a site visit please call the contacts listed below.
  • Bids are due before 1:00 PM on Thursday June 24, 2021 at the El Segundo Unified School District Office located at 641 Sheldon St., El Segundo, CA 90246. 
 

Each Bidder must complete and submit all of the following documents as its Bid:

  • Bid Form
  • Bid Bond or other security
  • Designated Subcontractors List
  • Noncollusion Declaration
  • Iran Contracting Act Certification
 

Thank you for your interest in our projects. If you have any questions please contact: 

 

Miguel Camacho 

(714) 497-7427

Mcamacho@TELACU.com

Bobby Dieken

(714) 351-0538

Rdieken@TELACU.com

 

 

21 – 008 Richmond Elementary School Restroom Upgrade Project
 

El Segundo Unified School District will begin construction on the ESUSD Richmond Restroom Project . Bids are due on July 1st, 2021 before 1 PM at the District Office located at 641 Sheldon Street, El Segundo, CA 90245.

Scope: All construction and services required to provide the renovation of two restrooms located inside Richmond Elementary School. 

 

Estimate: $300,000 plus an allowance of $30,000

 

Each Bidder must complete and submit all of the following documents as its Bid:

  • Bid Form
  • Bid Bond or other security
  • Designated Subcontractors List
  • Noncollusion Declaration
  • Iran Contracting Act Certification

 

Schedule: Construction is expected to begin July 2021 with project completion in August 2021.

License Requirements: Contract to be awarded to one Prime Contractor. Prime Contractor's License Requirements: B. Any subcontractor should have any license required for the scope of work they are performing. 

There is no Project Labor Agreement on this job and No prequalification required.

 

If you have any questions or would like to set up a site visit please contact:

Miguel Camacho, Project Engineer, Mcamacho@TELACU.com

Bobby Dieken, Project Manager, Rdieken@TELACU.com